India will spend ₹3 lakh Cr on the 5 GW build-out by 2030
Value chain opportunity for electrical / cooling HVAC players
Top 10 data center players in India –
Capacity build out to 2030 (GW IT load)
Provider
Live (2025)
Under build
+Announced
Data center BoM: ~54.3 Cr Per MW spent on DC build out;
IT infra / GPU spend of 3x over and above this
Live (2030)
Category
NonAI
AI
Cr/M Cr/MW
W
Non-AI
2.3 GW
(In ₹
K.Cr)
AI
2.7 GW
(In ₹
K.Cr)
Total
(In ₹
K.Cr)
% total
CtrlS
0.2
0.7
0.9
AdaniConneX
0.02
2.0
0.8
Civil & Architecture 17.4
14.8
40.0
40.2
80.3
27%
STT GDC India
0.3
0.7
0.8
Electricals
14.2
18.5
32.7
50.0
82.6
28%
Reliance / Jio
—
4
0.7
HVAC / Cooling
6.8
10.6
15.6
29.4
45.1
15%
Microsoft
0.06
1
0.7
3.6
4.0
8.4
10.9
19.3
7%
Google
0.08
1.1
0.6
AWS
0.05
0.8
0.5
Extra Low Voltage
(ELV)
Fire Protection
System
0.6
0.7
1.5
2.0
3.5
1%
Yotta Infra
0.07
0.3
0.4
High Speed Diesel
0.1
1.0
2.3
2.7
5.0
2%
TCS HyperVault
—
1
0.3
Public Health Engg.
0.1
0.1
0.3
0.3
0.6
0.2%
Other operators
0.69
1
0.9
10.5
12.1
24.1
32.9
57.0
19%
TOTAL
1.5
12.5
6.5
General
Requirements
TOTAL
54.3
62.4
124.8
168.4
293.2
100%
Players in the Data Center value chain in India
HVAC
Electricals
DG Sets